Podsumowanie treści

Strona 1 - CHINT Grid PV-Inverter

CHINT Grid PV-Inverter CPS SC1.5KTL, CPS SC2KTL, CPS SC2.8KTL, CPS SC4KTL, CPS SC4KTL-O Installation and Operation Manual Version 3.0E 2011.05

Strona 2

Edition 3.0E, 2011/05Parts Description Optional communications slot: RS485 & others LCD Display: Showing the inverter status Solar panel

Strona 3 - Contents

9 2. Features z Very high conversion efficiency z Automatic MPPT (Maximum Power Point Tracking) z Higher power capacity than similar products

Strona 4

Edition 3.0E, 2011/053. Installation instructions Opening the package After opening the package, please check the contents of the box. It should

Strona 5 - Before you start…

11 9 Check the ambient temperature of ins tallation is within specified range -20 ~ +55°C. 9 The AC grid voltage is 230VAC, 50Hz. 9 Electric

Strona 6 - Safety instructions

Edition 3.0E, 2011/05Mounting PV-Inverter to the wall 1. Select a wall or solid vertical surface that can support the PV-Inverter. 2. PV-Inverte

Strona 7 - Hot surfaces

13 5. Hang PV-Inverter on the mounting frame. 6. Check the installation conditions. a) Do not install the PV-Inverter on a slanted sur

Strona 8 - Limited Warranty

Edition 3.0E, 2011/05c) Insert safety-lock screws to the bottom leg to secure the inverter. CChheecckk tthhee sseeccuurree mmoouunnttiinng

Strona 9 - 1. Overview

15 Connecting to the grid (AC utility) 1. Measure grid (utility) voltage and frequency. It should be 230VAC, 50Hz, and single phase. 2. Open

Strona 10

Edition 3.0E, 2011/05TToo pprreevveenntt rriisskk ooff eelleeccttrriicc sshhoocckk,, eennssuurree tthhee ggrroouunndd wwiirree iiss pp

Strona 11 - 2. Features

17 ppeerrmmaanneennttllyy ddaammaaggee tthhee uunniitt.. CChheecckk sshhoorrtt--cciirrccuuiitteedd ccuurrrreenntt ooff tthhee PPVV sst

Strona 13

Edition 3.0E, 2011/054. System Diagram The typical connection diagram for the entire PV system is shown in the following figure. 1. PV Panel: P

Strona 14 - Edition 3.0E, 2011/05

19 5. Operation of PV-Inverter Initialization for Regulation Setting 1. The Inverter provides a “Initialization” function at the first time sta

Strona 15

Edition 3.0E, 2011/05 Modes of operation There are 3 different modes of operation. 1. Normal mode: In this mode, the inverter works normally. Whe

Strona 16

21 3. Shutdown mode: During per iods of little or no sunlight, inverter automatically stops running. In this mode, inverter does not take any

Strona 17

Edition 3.0E, 2011/05Front Panel Operating PV-Inverter is quite easy. During normal operation, the inverter runs automatically. However, to ach

Strona 18

23 information. Each subsequent press changes the display. The display sequence is shown in panel LCD display sequence figure on next page. 4.

Strona 19

Edition 3.0E, 2011/05LCD Display Sequence LCD display sequence Frequency=xx.xHz Pac=xxxx.xW Etoday=xx.xxkWhEac=xx.xkWh Vdc

Strona 20 - 4. System Diagram

25 Auto Test Setting (Only for ENEL GUIDE 2010 model) The Inverter is supplied with an auto test function which enables the user to check that

Strona 21 - 5. Operation of PV-Inverter

Edition 3.0E, 2011/05Auto Test If the threshold and the grid voltage are equal, the PV Inverter switches to fault. Display shows a message simil

Strona 22

27 Auto Test If all the above tests have been performed, the display shows the message TEST PASSED. PV Inverter switches to normal operation mo

Strona 23

1 Contents Before you start…...3 Safety instru

Strona 24 - Information during

Edition 3.0E, 2011/05Auto Test Record (Only for ENEL GUIDE 2010 model) After the Auto test setting, inverter will record the test result value

Strona 25 - Contrast setup

29 Maximum Power Point Tracking (MPPT) A good PV inverter must be able to convert the maximum power from any PV panel. Due to its advanced des

Strona 26

30 Edition 3.0E, 2011/05 6. Inverter Status This inverter is designed to be user-friendly; therefore, the status of the Inverter can be easily

Strona 27

31 Operating conditions In English In German In Italian Description FLASH FLASH FLASH FLASH FLASH firmware Monitoring Parameters I

Strona 28 - Auto Test

32 Edition 3.0E, 2011/05 Operating conditions In English In German In Italian Description System Fault Isolation failure Isolation fa

Strona 29

33 Operating conditions In English In German In Italian Description Output relay failure Relay Failure Relaisfehler Err.relè The relay

Strona 30

34 Edition 3.0E, 2011/05 Operating conditions In English In German In Italian Description System Information Model display CPS SC1.5KT

Strona 31

35 LED There are 2 LED’s on the inverter, one is green and the other is red. Normally, only the green LED s witches on during operation. Their i

Strona 32 - 6. Inverter Status

Edition 3.0E, 2011/057. Communications This inverter is equipped with a po werful communications interface and options. Use “Pro Control” to mo

Strona 33 - Operating

37 TToo pprreevveenntt rriisskk ooff ddaammaaggee iitt iiss rreeccoommmmeennddeedd tthhaatt oonnllyy aauutthhoorriizzeedd ppeerrssoon

Strona 34

Edition 3.0E, 2011/05LCD Display Sequence... 24 Auto Test Setting (Only for

Strona 35

Edition 3.0E, 2011/058. Trouble shooting In most situations, the inverter requires very little service. However, if inverter is not able to wor

Strona 36

39 Over temperature 1. The internal temperature is higher thanspecified normal value 2. Find a way to reduce the ambient temperature.3. Or move

Strona 37

40 Edition 3.0E, 2011/05 9. Specifications Model CPS SC1.5KTLCPS SC2KTLCPS SC2.8KTLCPS SC4KTL CPS SC4KTL-O Germany (DE) V V V V V Italy

Strona 38 - 7. Communications

41 Model CPS SC1.5KTLCPS SC2KTLCPS SC2.8KTLCPS SC4KTL CPS SC4KTL-O DC insulation resistance2 > 5MΩ Output (AC) Nominal AC power 1

Strona 39

42 Edition 3.0E, 2011/05 Model CPS SC1.5KTLCPS SC2KTLCPS SC2.8KTLCPS SC4KTL CPS SC4KTL-O Disconnection time of excess operational frequency ran

Strona 40 - 8. Trouble shooting

43 Model CPS SC1.5KTLCPS SC2KTLCPS SC2.8KTLCPS SC4KTL CPS SC4KTL-O Operational voltage range7 (F/W Setting) 212~256V Step1 : 207~246V S tep2 :

Strona 41

44 Edition 3.0E, 2011/05 Model CPS SC1.5KTLCPS SC2KTLCPS SC2.8KTLCPS SC4KTL CPS SC4KTL-O Re-connecting time after disconnection 180 sec 180 se

Strona 42 - 9. Specifications

45 Typical Efficiency Charts vs. Load CPS SC1.5KTL CPS SC2KTL CPS SC2.8KTL CPS SC4KTL / CPS SC4KTL-O Note: Test equipment toler

Strona 43

Edition 3.0E, 2011/054610. Disposal The dealer or installers should remove the PV Inverter from the array and contact the supplier for disposal

Strona 44

47 11. Contact Information Should you ha ve technical problems concerning this product, please contact our Service line. We require the fo ll

Strona 45 - tep2 : 189~256V

3 Before you start… Congratulations on choosing CHINT Grid PV-Inverter (referred to in this manual as “PV-Inverter”, or simply “Inverter”). CHIN

Strona 46

Edition 3.0E, 2011/054812. Regulation & Certificate Regulatory Type CPS SC1.5KTLCPS SC2KTL CPS SC2.8KTLCPS SC4KTL CPS SC4KTL-OVDE0126-1-1

Strona 47 - CPS SC4KTL / CPS SC4KTL-O

49 VDE Certificate (European models)

Strona 48 - 10. Disposal

Edition 3.0E, 2011/05Safety instructions Risk of Electric Shock 11.. DDoo nnoott rreemmoovvee tthhee ccaassiinngg.. TThhee IInnvveerrtt

Strona 49 - 11. Contact Information

5 Hot surfaces Although designed to meet all safety requirements, some parts and surfaces of the PV-Inverter are still hot during operation.

Strona 50

Edition 3.0E, 2011/05Limited Warranty The Inverter comes with a standard 5-year warranty. An optional extended warranty is available for purchase

Strona 51

7 1. Overview Model Front View Bottom View CPS SC1.5KTL CPS SC2KTL CPS SC2.8KTL CPS SC4KTL CPS SC4KTL-O

Komentarze do niniejszej Instrukcji